Howzit. A few people asked after my comment in the homelab thread, so here's the long version. Ja, it's long. Make tea.

Context for the non-South Africans: for a few years "load shedding" was just life here. Scheduled power cuts, two to four hours at a time, sometimes three times a day, announced by stage (stage 2, stage 4, stage 6 when things were really bad). You planned your cooking, your gym, your deploys and your kid's bath around the EskomSePush app. The lights have been mostly on lately and I still don't trust it for one second. Nobody I know has taken their inverter out.

What we installed

Bought in two goes, because who has that money all at once.

  • Round 1 (early 2023, peak panic): a 5 kW hybrid inverter and one 5.12 kWh LiFePO4 battery. Installed, with a proper COC (certificate of compliance), roughly R58,000. Prices were silly then, everyone was buying.
  • Round 2 (2024): six 450 W panels on the north-facing roof (2.7 kWp) plus a second 5.12 kWh battery. Roughly R46,000 installed. Panels had come down a lot by then.

So about R104,000 all in, a bit under US$6,000 depending on what the rand is doing this week. Not small money. We financed half of round 2 through a bank solar loan.

What it actually does

On a clear winter day the panels make around 10 to 12 kWh, summer more like 13 to 15 (afternoon storms eat some of it). Our house uses about 14 kWh a day on average, more in winter because of a heater in my daughter's room. Over a year the solar covers somewhere between 55 and 60% of what we use. The geyser is still on the grid with a timer, because heating water off batteries is silly.

With 10 kWh of storage (you don't run LiFePO4 to zero, so call it 8 usable) the essentials ride through even a long cut: fibre ONT and router, the fridge, lights, the TV, two laptops, and the homelab. The oven and the kettle are on a separate non-essential circuit, which was the best R3,000 of the whole project, because it means nobody can boil a kettle at 7 pm and drain my battery.

The homelab bit

The homelab is small on purpose: a mini PC running Proxmox (about 15 W idle), a two-bay NAS (about 20 W with disks spinning), the router and a switch. All in it idles around 50 W, so roughly 1.2 kWh a day. I used to run an old tower server that idled at 110 W and I could literally watch it eat the battery on stage 6 evenings. Selling it was the single biggest "upgrade" I made.

The ONT and router are also on a little 12 V DC mini UPS (one of those R700 ones with barrel plugs) as a second layer, because inverters do occasionally trip, and when you're on call for payments you don't want the Wi-Fi to blink while the inverter thinks about its life.

What I'd do differently

  1. Panels first, not battery first. We did it backwards because of panic. A battery with no panels just charges from Eskom between cuts, which helps you survive but saves you nothing.
  2. Size the essential circuit honestly. Walk around the house and decide what really needs to stay on. The answer is less than you think.
  3. Get the installer to show you the monitoring app before they leave. I spent a month not knowing the battery was set to stop discharging at 50% (installer default "for longevity"), which halved what I'd paid for.
  4. Kill your idle watts before you buy kWh. Every 10 W of always-on is 240 Wh a day. That old server cost me more battery than my fridge.

The work bit

This is the part I actually wanted to write. Living through load shedding changed how I design systems. I build payment services in Go, and in my head the default assumption is now: the lights go out mid-transaction. Not "might". Will. Your pod dies, your node gets drained, the card network times out, your customer's phone dies in a taxi on the N1. So:

  • Every request that moves money carries an idempotency key from the client, and the server stores the key with the result before replying. A retry gets the same answer, not a second debit.
  • State changes go through an outbox table in the same Postgres transaction as the business write, and a separate worker publishes to Kafka. If we die between the commit and the publish, the worker picks it up after restart.
  • Anything that talks to a third party is a state machine with a "we don't know" state (PENDING_UNKNOWN in our code) and a reconciler that goes and asks. Timeouts are not failures. They're questions.

None of that is new. It's in every distributed systems book. But it lands differently when you've lived it with a cranky toddler and a fridge full of meat at stage 6.

Shame, this got long. Questions welcome, especially if you're in SA and trying to decide on sizing.

Written by

Lindiwe Mokoena

Senior backend dev, fintech, Joburg. Go, Kafka, AWS. Homelab runs on an inverter because Eskom trauma is permanent. Mom of one, owner of zero free time.

Get the best of Dynamo Geeks weekly

One email each Monday with the most useful posts. No spam; unsubscribe in one click.

Comments

12

Sign in to join the conversation.

Sign in to comment
Oluwatobi Adeyemi@tobi_freelance
omo this is the most relatable post I have read from outside Nigeria. "timeouts are not failures, they are questions", my sister I am stealing it. our NEPA is your Eskom
5 net votes
Lindiwe Mokoena@loadshedding_lindi
ha! solidarity. every African dev has the same inverter in their heart
3 net votes
Freya Collins@freya_bristol
This is brilliant, thank you for the actual numbers. The 50% discharge floor default is criminal, we see the same thing with members' home batteries at the co-op, installers set conservative limits and nobody ever changes them. Have you looked at charging from the grid off-peak, or is there no time-of-use tariff for you?
6 net votes
Lindiwe Mokoena@loadshedding_lindi
City Power does have a TOU option but switching meters is its own saga, eish. for now the battery charges from the sun and Eskom tops it up when it feels like it
5 net votes
Rafiul Islam@rafi_dhaka
Dhaka load shedding gang here. we have IPS (that's what we call the inverter) since forever. the idle watts point is so true, my old desktop was eating the IPS alive
2 net votes
Karthik Subramaniam@karthi_rustacean
The outbox in the same transaction plus a reconciler for the unknown state is exactly right. Most people skip the "we don't know" state and treat a timeout as a failure, then they refund a payment that actually went through. Very good post.
1 net votes
Alasdair Reid@onprem_or_die
50 watts idle. someone who understands the cheapest kWh is the one ye dinnae use. respect.
6 net votes
Lindiwe Mokoena@loadshedding_lindi
careful, that was almost nice
0 net votes
Ankit Khurana@faang_or_bust
or just move to a country with working electricity lol
1 net votes
Lindiwe Mokoena@loadshedding_lindi
ja no. my family is here, my whole life is here, and my kid's netball team is here. I'll take my 8 kWh and my sense of humour over your attitude, thanks. go touch grass, faang
2 net votes
Sayan Mukherjee@bong_bugs
bro said this from bengaluru where the power goes every time it rains 💀
1 net votes
Chaminda Perera@chaminda_sysops
Very good write-up, Lindiwe. In Colombo in 2022 we had 13 hour power cuts, and our core banking DR plan suddenly became our daily routine plan. The PENDING_UNKNOWN state is something I wish every vendor understood. Aney, the number of reversals we did by hand that year.
1 net votes